سال انتشار: ۱۳۹۱

محل انتشار: هشتمین کنفرانس بین المللی مهندسی صنایع

تعداد صفحات: ۴

نویسنده(ها):

Maryam Alimardani, – University of Tehran
Reza Reza Tavakkoli-Moghaddarn, –
Asefeh Hasani-Goodarzi –

چکیده:

This paper considers a new mathematical model for a two-machine flowshop scheduling problem with idle insert and sequence-dependant set up time in order to fmd a more realisticcondition. The aim of this model is to minimize the sum of maximum earliness and tardiness and to minimize the maximumcompletion time (makespan or Cmax)· To show the validity of the model, a number of test problems are solved and the associatedresults are reported