سال انتشار: ۱۳۹۱

محل انتشار: دهمین همایش بین المللی سواحل، بنادر و سازه های دریایی

تعداد صفحات: ۱۰

نویسنده(ها):

Masoud Hosseini – Msc – Sahel Consulting Engineers
Hassan Akbari – Msc – Sahel Consulting Engineers

چکیده:

As a part of Shahid Beheshti Port development project, existing breakwater shall be further extended about 1500m. Since the quarry material is available in the vicinity of project area, the rubble mound breakwater with armor stone has been selected for the extension parts. Considering the high design waves, the conventional breakwater needs large heavy rocks. However the extraction, transportation and handling of rock is limited to access to quarrywith appropriate quality of rock in the vicinity of project location and also availability of equipments with enough capacity. Therefore, with considering these limitations, Berm Breakwater has been selected as the best alternative. This type of breakwater is allowed to bereshaped statically or dynamically and its dimensions are a function of acceptable extends ofrecession area. In this project for verifying the designed breakwater, 2D and 3D physical modeling tests has been implemented to ensure the structure stability. Same section for breakwater trunk and round head has been tested under several hydrodynamic conditions